Already a Subscriber? Log in
Get Instant Access to This Article
Subscribe to Mainebiz and get immediate access to all of our subscriber-only content and much more.
- Critical Maine business news updated daily.
- Immediate access to all subscriber-only content on our website.
- Bi-weekly print or digital editions of our award-winning publication.
- Special bonus issues like the Mainebiz Book of Lists.
- Exclusive ticket prize draws for our in-person events.
Click here to purchase a paywall bypass link for this article
Lyman-Morse in Thomaston officially opened its advanced composites center — a move that further diversifies the company and makes it less dependent on boatbuilding.
The 15,000-square-foot facility supports large-scale composite fabrication and assembly, marking a significant expansion of the company’s manufacturing campus.
Construction on the $4 million project started in May. The project team included Chuck Campbell PLLC in Waldoboro for architectural services and Maine Coast Construction in Camden as general contractor, also providing architectural services.
On Friday, Oct. 16, Drew Lyman and the Lyman-Morse team cut the ribbon on the new center.
Advanced technology, heavy duty equipment
The $4 million project cost includes the building as well as specialized equipment, including full-width overhead cranes, radiant-floor heat, a solar array and other high-tech equipment.
While the center is designed to build boats made of the most advanced materials, the building also sports some brawny features.
A pair of five-ton overhead cranes will ease the movement of heavy objects throughout the building.
"Having overhead cranes, having a clear-span building — you spend a little more money for that stuff — but it gives us flexibility for the future," Lyman told employees and the group gathered at the ribbon-cutting.
Compressed air lines, vacuum pumps and IT infrastructure are integral parts of the outfitting needed for composite manufacturing.
Power will be supplemented with a 150-kilowatt solar array.
For the workers' comfort and to maintain a stable temperature for the use of epoxies and other adhesives, a radiant-floor heat system will provide consistent climate control for construction projects and teams.
Tackling complex projects
The interior layout is engineered for flexibility, allowing teams to manage complex manufacturing projects while maintaining precision and efficiency.
The building levels up Lyman-Morse’s scale, efficiency and technical capacity.
While Lyman-Morse has its roots in the marine industry, its clients today include industrial, defense and specialized fabrication.
"The ebb and flow on the yacht side is challenging," Lyman said Friday. "We looked at how to invest in areas that could stabilize the company [such as the] metal shop, composite shop. That has stabilized the company."
The company has said the new site will allow it to take on larger and more complex projects.
Nearly half of the project cost — $1,985,502 — came from a program that provides loans with favorable terms and is administered by Maine Technology Institute’s Maine Technology Asset Fund.
The company expects to add up to 25 employees over the next five years.
Lyman-Morse was founded in 1978 by Drew Lyman's parents, Cabot and Heidi Lyman, who acquired the assets of the former Morse Boatbuilding Co. Drew Lyman was honored as a Mainebiz Business Leader of the Year in 2023.
Today, Lyman-Morse is involved in boatbuilding, service and refits and manufacturing with related marina and brokerage operations. The company has 170 employees.
Editor's note: Jim Neuger, Stephanie Meagher and Laurie Schreiber contributed to this report.Â